Coal Fired Steam Boiler Installation and Commissioning

Coal Fired Steam Boiler Installation and Commissioning

Brand:Shengli Boiler
Brief:Water-fire tube structure
Rated Capacity: 1 ton/hr-20 ton/hr 0.7MW-10.5MW
Rated working pressure:0.7/1.0/1.25/1.6/3.82Mpa 6bar

Product Details

Coal fired steam boiler installation and commissioning

Coal fired steam boiler 22.jpg

      1-10ton/hr coal fired steam boiler is packaged boiler and customer can use it directly .For 15-20 ton/hr boiler ,it has two parts which include boiler body and chain grate ,when coal fired steam boiler is deliveried to the site of customer ,we will use the crane to get these two parts together and welded .

     Before the coal fired steam boiler lefts country ,customer should make the foudation .We can provide the foudation drawing of coal fired steam boiler for customer.Meanwhile ,customer should provide the crane to lift the coal fired steam boiler and boiler accessories .Professional welders are necessary .After installation of boiller part ,then the induced draft fan , multi-cyclone collector ,economizer ,air duct is assembled the rear of boiler body according to the requirements of drawings.The asbestos ropes are embeded in the flange joints to ensure the tightness and prevent the air leakage .Our engineer will check weather the motor steering is correct ,friction vibration ,motor temperatuer is normal and so on .

DZL first coal fired steam boiler.jpg

201801101336156903638.jpg201801101336151416963.jpg

Hot Tags

Hot Tags: coal fired steam boiler installation and commissioning, China, manufacturers, suppliers, factory, for sale, prices, cost, best
Related Products

Inquiry